Project Dobrich II

Description

The project foresees the development of 8 plots and the construction of 8 wind turbines with installed capacity up to 3 MW each.

Status

A wind measuring mast was installed in November 2009.

Conducted an EIA procedure and changed designation of land in the beginning of 2012.

Photos