A second Vestas V90 (2 MW, 105 m hub height) followed near the first in 2013.
Since 2026 the site has 4.48 MWh of CATL battery storage.
On site







A second Vestas V90 near Balchik, in operation since 2013 and hybridised in 2026.
A second Vestas V90 (2 MW, 105 m hub height) followed near the first in 2013.
Since 2026 the site has 4.48 MWh of CATL battery storage.







In operation
Get in touch
We’re always interested in new opportunities and partnerships.