In 2014 we installed a Vestas V112 (3 MW, 119 m hub height) at the same site, the first V112 in Bulgaria.
With 6.92 MWh of CATL battery storage added in 2026, it is now one of the first hybrid wind-and-storage plants in the country.
On site






The first Vestas V112 in Bulgaria, in operation since 2014 and hybridised with 6.92 MWh of storage in 2026.
In 2014 we installed a Vestas V112 (3 MW, 119 m hub height) at the same site, the first V112 in Bulgaria.
With 6.92 MWh of CATL battery storage added in 2026, it is now one of the first hybrid wind-and-storage plants in the country.






In operation
Get in touch
We’re always interested in new opportunities and partnerships.